Jordi Marcè
cronology
- Burners. Vitoria, Brazil
- CEIP. La Riera
- Cementery. Rubí
- Civic Center. L'Ametlla de Mar
- Civic Centre. Platja d'Aro
- Civic Centrer. Begues
- Collet 360. Calonge
- Competition Sants
- Competition Sarrià. Barcelona
- Competition. Barcelona
- Competition. Brazil
- Competition."ITSE" Panama
- Competition.Panama
- Competition.Panama
- Competition.Panama
- Competition.Panamá
- Concert Hall. Panama
- Concert Hall. Panama
- Cultural Center.Vitoria, Brazil
- EEMIL.Vitoria, Brazil.
- Exhibition centre. Panama
- Fire brigade. Barcelona
- Gamon-Medina Foundation
- Hospital. Panama
- Ilha do Crisógono. Vitoria, Brazil
- Law Faculty.Barcelona
- Law School UB.Construction
- Law School UB.Executive projet
- Law School UB.Lighting.
- Law School UB.Preliminary study
- Library. Platja d'aro
- Meeting Point. Tarragona
- Meeting point_built. Tarragona
- Multiporpose Building. Girona
- Municipal Nursery. Altafulla
- New Market.Madrid
- Nursery School. Viladecavalls
- Park - Public Facility in Begur
- Park - Public Facility in begur
- Peralada football field
- Platja Gran Estartit
- Police Headquarters
- Police Headquarters II
- Police Station. Platja D'Aro
- Preliminary Study.Madrid
- Punta d'en Pau. S'Agaró
- Pérez Simon Collection Museum
- Pérez Simon Collection Museum - extension
- Refurbishment of Public Library Platja d'Aro
- Refurbishment of the local police station in Platja d’Aro
- Roof of the Sports Hall in Platja d’Aro
- Silicon Collet. Calonge
- Sport Pavilion. Palafrugell
- Sport Pavillion. Piera
- Sports Center
- Sports Pavilion. Altafulla
- Sports Pavillion. Lloret de Mar
- Stops Ramblas. Barcelona
- Swimming Pool. Tarragona
- Swimming pool. Altafulla
- Swimming pool. Barcelona
- Swimming pool. Calonge
- Swimming pool. Calonge
- Swimming pool. Tortosa
- Teià Sant Berger Facilities
- Town Hall. Gualta
- Town hall courtyard. Calonge
- Tribune I. Esplugues
- Tribune II. Esplugues
- Tribune. Altafulla
- UIB. Mallorca
Preliminary study for Sports Center
The sports center is an isolated building, binds to the existing building by a ramp that connects the spectators area and the sports court with it.
Functionally the existing changing rooms in the athletic complex will be used for the new sports center, thus we won't built any new ones.
We keep the existing main entrance the facility in the northern part of the new sports center, and we design a second connection through the green area to access either in the spectators area or to the existing changing rooms, through a new linear pergola along the north facade of the new building.
On the south side is enabled an access for vehicles that, through a ramp on the eastern façade, has a direct access to the court, allowing easy access for maintenance or for possible events.
The building is a unique volume of 51x41m, plus the small connection volumes that conect with the existing building. The pavilion has two levels, the level of the sports court that for topographical reasons would be at the height +141.00, and the perimetral spectators area is at elevation +142.00.
Functionally the existing changing rooms in the athletic complex will be used for the new sports center, thus we won't built any new ones.
We keep the existing main entrance the facility in the northern part of the new sports center, and we design a second connection through the green area to access either in the spectators area or to the existing changing rooms, through a new linear pergola along the north facade of the new building.
On the south side is enabled an access for vehicles that, through a ramp on the eastern façade, has a direct access to the court, allowing easy access for maintenance or for possible events.
The building is a unique volume of 51x41m, plus the small connection volumes that conect with the existing building. The pavilion has two levels, the level of the sports court that for topographical reasons would be at the height +141.00, and the perimetral spectators area is at elevation +142.00.
Year: 2014