Jordi Marcè
cronology
- Burners. Vitoria, Brazil
- CEIP. La Riera
- Cementery. Rubí
- Civic Center. L'Ametlla de Mar
- Civic Centre. Platja d'Aro
- Civic Centrer. Begues
- Collet 360. Calonge
- Competition Sants
- Competition Sarrià. Barcelona
- Competition. Barcelona
- Competition. Brazil
- Competition."ITSE" Panama
- Competition.Panama
- Competition.Panama
- Competition.Panama
- Competition.Panamá
- Concert Hall. Panama
- Concert Hall. Panama
- Cultural Center.Vitoria, Brazil
- EEMIL.Vitoria, Brazil.
- Exhibition centre. Panama
- Fire brigade. Barcelona
- Gamon-Medina Foundation
- Hospital. Panama
- Ilha do Crisógono. Vitoria, Brazil
- Law Faculty.Barcelona
- Law School UB.Construction
- Law School UB.Executive projet
- Law School UB.Lighting.
- Law School UB.Preliminary study
- Library. Platja d'aro
- Meeting Point. Tarragona
- Meeting point_built. Tarragona
- Multiporpose Building. Girona
- Municipal Nursery. Altafulla
- New Market.Madrid
- Nursery School. Viladecavalls
- Park - Public Facility in Begur
- Park - Public Facility in begur
- Peralada football field
- Platja Gran Estartit
- Police Headquarters
- Police Headquarters II
- Police Station. Platja D'Aro
- Preliminary Study.Madrid
- Punta d'en Pau. S'Agaró
- Pérez Simon Collection Museum
- Pérez Simon Collection Museum - extension
- Refurbishment of Public Library Platja d'Aro
- Refurbishment of the local police station in Platja d’Aro
- Roof of the Sports Hall in Platja d’Aro
- Silicon Collet. Calonge
- Sport Pavilion. Palafrugell
- Sport Pavillion. Piera
- Sports Center
- Sports Pavilion. Altafulla
- Sports Pavillion. Lloret de Mar
- Stops Ramblas. Barcelona
- Swimming Pool. Tarragona
- Swimming pool. Altafulla
- Swimming pool. Barcelona
- Swimming pool. Calonge
- Swimming pool. Calonge
- Swimming pool. Tortosa
- Teià Sant Berger Facilities
- Town Hall. Gualta
- Town hall courtyard. Calonge
- Tribune I. Esplugues
- Tribune II. Esplugues
- Tribune. Altafulla
- UIB. Mallorca
Competition Sport Pavillion. Palafurgell, Girona.
One of the main objectives in this project is to respect and improve the relation of the project with the building of the present sport pavilion.
The project is developed in two stages. First stage try to the cover of the existing sport pavilion out court.
The second stage contemplates a solution to close the building.
The functional program is developed with the volume of the court in the correct solar direction and with a height 8.50m, proposed by the Consell Català de l' Esport.
The other services are arranged in U type, with an inferior height, around the main volume of the track, organized in two floors superposed in a logic functions spaces.
The project is developed in two stages. First stage try to the cover of the existing sport pavilion out court.
The second stage contemplates a solution to close the building.
The functional program is developed with the volume of the court in the correct solar direction and with a height 8.50m, proposed by the Consell Català de l' Esport.
The other services are arranged in U type, with an inferior height, around the main volume of the track, organized in two floors superposed in a logic functions spaces.
Year: 2009
Location: Palafrugell, Girona.
Customer: Ajuntament de Palafrugell.
Area: 1865.99m2
Location: Palafrugell, Girona.
Customer: Ajuntament de Palafrugell.
Area: 1865.99m2