Jordi Marcè
cronology
- Amador Masterplan , Panama.
- Amador's Masterplan, Panama.
- Arcos business country club.
- Balneario Jafre. Girona
- Barranco Resort. Vilaplana
- Beach Resort. Panama
- Bungalows. Algeria
- Cala del Pi Resort
- Calonge-Sant Antoni Resort.Girona
- Castell Montgrí Campsite - outdoor space
- Castell Montgrí Campsite - restaurants
- Commercial Park. Panama
- Conceptualization Altos de Batele
- Eco-Resort-Park.Puigcerdà
- Equestrian Center. Granada
- Formation Centre. Barcelona
- Geriatric Centre. Altafulla
- Guadix Golf Resort
- Holiday Resort. Algeria
- Horse racecourt. Maia
- Hotel Resort. Guadix
- Hotel resort. Ibiza
- Hotel resort. Teià
- Houses. Arcos de la Frontera.
- La Romera Residential Resort
- Leisure Center. Kiev
- Life resort Fornells de la Selva
- Marina Hemingway
- Marina. Panama
- Master Plan Altos de Batele
- Master Plan. Cabo Santos
- Master Plan.Peralada
- Masterplan LUMINE
- Mountain Resort
- Nautic Park. Panama
- New resort. Canillo
- Oued Chbika Masterplan, Morocco
- Pool.Girona
- Port Valencia Nord Competition
- Preliminary Study for the building of a Housing Development Villa Palomeras. Málaga
- Punta Duarte residential and tourist resort, Panama
- Racing Circuit. St. Pere Ribes
- Resort Baishan, China
- Resort Playa Mujeres
- Resort in Mexico
- Resort. Algeria
- Resort. Algeria
- Resort. Mexico
- Resort. Portugal
- Resort. Skikda
- Resort. Ucrania
- San Lorenzo. Panama
- Sherman. Panamá
- Silicon Guadix: Park - Public Facility in Guadix
- Technological Park. Peralada
- Teià Masterplan
- The lodge Raimat.
- Three-satr Resort
- Tourist Village. Skikda
- Touristic Complex Aznalcázar
Expansion Hotel Cala del Pi - Platja d'Aro. Basic project
The project expands the Cala del Pi hotel by 15 suite-type rooms, with terraces and small pools for private use.
2 independent buildings are planned, consisting of a ground floor and 2 floors. The roof will be flat and accessible from the rooms on the second floors.
Outdoor swimming pools are projected outside, integrated into the environment and respecting the current topography as much as possible. The pools adapt to the terrain forming different vessels, reducing the walls to the maximum on the natural terrain, in no case do they exceed the maximum height of one meter above the natural terrain.
The open space of the plot will be left as natural as possible while maintaining the character of the current pine forest, which is why the minimum number of trees will be affected.
2 independent buildings are planned, consisting of a ground floor and 2 floors. The roof will be flat and accessible from the rooms on the second floors.
Outdoor swimming pools are projected outside, integrated into the environment and respecting the current topography as much as possible. The pools adapt to the terrain forming different vessels, reducing the walls to the maximum on the natural terrain, in no case do they exceed the maximum height of one meter above the natural terrain.
The open space of the plot will be left as natural as possible while maintaining the character of the current pine forest, which is why the minimum number of trees will be affected.
Location: Castell-Platja d’Aro, Girona
Year: 2022
Client: Sallés Hotels
Area: 1,727 sqm
Year: 2022
Client: Sallés Hotels
Area: 1,727 sqm