Jordi Marcè
cronology
- Access area AMED.Tarragona
- Badalona Plana Square
- Beach Club, Madrid.
- Botanical. Calonge
- Boulevard, Bulgaria
- Castell d’Aro - Street Redevelopment
- Catalunya square. Calonge
- Central Plaza.Madrid
- Central Square. Platja d'Aro
- Children Plaza. Madrid
- Companys Square. Cornella
- Competition. Barcelona
- Competition.Plaza.Viladecans
- Concordia square. Calonge
- Europa Plaza. Platja d'aro
- Events Plaza.Madrid
- Fontainebleau Park. Le Kremlin-Bicêtre - Paris
- Garden lighting
- Garden. Reus
- Gardens. Barcelona
- Grand Sud public space. Le Kremlin-Bicêtre - Paris
- Llibertat square. Calonge
- Main Access
- Marqué Square. Skikda
- Mediterranean Garden.Tarragona
- Mill Pond.Tarragona
- Mommercial avenue. Sofia
- Murlà Square. Sant Feliu
- Park AMED.Tarragona
- Park. Vitoria, Brazil
- Park. Vitoria, Brazil
- Parking garden Cadiretes
- Penedès Square. Vilafranca
- Pic-Nic Vilartagues
- Platja d’Aro – Urban renewal
- Port Ginesta – Parking garden
- Public Space.Doha, Qatar
- Public Square. Sants-Montjuïc
- Publics spaces. Cabeca
- Raimat Essence.
- Repartidor Square. Hospitalet
- Safsaf stream. Algeria
- Square in Vall-Llobrega
- Square. Barcelona
- Square. Panam
- Square. Tarragona
- Square. Tortosa.
- The Esplanade.Tarragona
- The Games Av.Tarragona
- Turó Parc. Barcelona
- Urban Centre. La Garriga
- Urban Development PMU-06 Palamós
- illa Gran Restoration. Roses
Urban development project and design of the central public space of the PMU-06 sector: Camí de la Font –Rentadors St, Palamós
The PMU-06 sector is located in the urban growth area of Palamós, surrounded on three sides by another planning sector, with a similar building typology (alignment to the street). Currently there are industrial buildings and unused plots in our sector.
The development objective of the sector is to transform the existing urban planning model, changing the current uses to a residential model, with a public green area in the center of the sector, occupying 32% of the area's surface.
The urbanization project defines the paving, the drainage system, the sanitation networks, drinking water, telecommunications, public lighting, electrification and adaptation of the green areas.
The central public space is treated as a square, a meeting place for the residential area, with 6 different areas for activities and rest.
The development objective of the sector is to transform the existing urban planning model, changing the current uses to a residential model, with a public green area in the center of the sector, occupying 32% of the area's surface.
The urbanization project defines the paving, the drainage system, the sanitation networks, drinking water, telecommunications, public lighting, electrification and adaptation of the green areas.
The central public space is treated as a square, a meeting place for the residential area, with 6 different areas for activities and rest.
Location: Palamós, Girona
Year: 2023
Client: Moradell i Fills SL
Area: 5,784 sqm
Year: 2023
Client: Moradell i Fills SL
Area: 5,784 sqm