Jordi Marcè
cronology
- 1 house. Altafulla
- 1 house. Campins
- 1 house. Castellterçol
- 1 house. Corçà
- 1 house. Esplugues
- 1 house. Ferran
- 1 house. Foixà
- 1 house. Fornells
- 1 house. La Pobla
- 1 house. Lliçà d'Amunt
- 1 house. Lliçà d'Amunt
- 1 house. Teià
- 1 house. Teià II
- 1 house. Tortosa
- 1 house. Ullastrell
- 1 house. Vallromanes
- 1 house. Vallvidrera
- 1 House. L'Escala
- 1 House. Lleida
- 1 house. Matosinhos
- 9 Houses
- Alt Penedès 25 Houses
- Bonanova 7 Houses.
- Can Munt 8 Houses.
- Cap Martinet 8 houses.
- Collsabadell - Llinars del Vallès 9 single-family homes
- Flat house: housing Golf Barcelona / Masia Bach
- Girona 11 Houses
- Girona 11 Single-family Houses
- Golf Peralada 5 Single Family Homes
- Hotel. ibiza
- House at Boulakroud. Algeria
- Housing in Peralada
- Ibiza 32 single family houses.
- L'Ametlla de Mar. 27 Houses.
- La Floresta 3 houses.
- Lleida 5 single-family homes
- Llinars del Vallés 9 Houses
- Malaga 29 Houses
- Masia Bach Phase 1: 4 housing units
- Masia Bach Phase 2: 5 housing units
- Masia Bach Phase 3: 3 housing units
- Masia Bach Phase 4: 4 housing units
- Modular house: housing Golf Barcelona / Masia Bach
- PAU 16 Calonge Housing
- Peralada - preliminary study 5 homes
- Peralada 4 Houses
- Riera de Gaià 2 houses.
- Single Family Hose. Gerona
- Tarragona preliminary study - 2 housing units
Conclusion of works of an insolated single-family house
The intervention building is a single-family house, of three levels, located in the municipal term of Foixà. Constructed in a 50%.
The present construction was begun with a work license of twenty years ago and for many reasons beyond of the property the works were stopped. Until then already the earth movement had been made, the laying of foundations, the structure of the three levels, the work closings of the facades and the plumbing too.
The criterion to finish works wants to be respectful with the project displayed initially. The present built volume will stay and the materials will be defined of finished of the facade that will try the most integration to the lot.
The state of works, considering the abandonment of so many years, can be considered correct.
Even so, the substitution of different elements is anticipated, that still having and executed in first stage of works, they have been deteriorated and its substitution is advised.
The present construction was begun with a work license of twenty years ago and for many reasons beyond of the property the works were stopped. Until then already the earth movement had been made, the laying of foundations, the structure of the three levels, the work closings of the facades and the plumbing too.
The criterion to finish works wants to be respectful with the project displayed initially. The present built volume will stay and the materials will be defined of finished of the facade that will try the most integration to the lot.
The state of works, considering the abandonment of so many years, can be considered correct.
Even so, the substitution of different elements is anticipated, that still having and executed in first stage of works, they have been deteriorated and its substitution is advised.
Year: 2004
Situation: Foixà, Girona.
Customer: One for one design
Situation: Foixà, Girona.
Customer: One for one design