Jordi Marcè
cronology

Score written in Treble Clef. Gastro Park Music Beach Marina Badalona

The object of the commission is the analysis, optimization and improvement proposal of the current urbanization of the north pier, in order to provide the restaurant premises with a renovated environment, with a unitary design criterion, proposing material solutions for terrace pergolas, urban green, pavements, etc. without losing road functionality, access to the car park and the dock attached to the breakwater.
Situation: Badalona, Barcelona
Year: 2022
Client: Marina de Badalona and Port de Badalona
Area: 7.700 m2
Length: 200 meters