Jordi Marcè
cronology
- Detail Study. Andorra
- ARE Can Soler. Sant Boi
- Cabeca. Andorra
- Cité des Martinets. Le Kremlin-Bicêtre - Paris
- Detail Study. Guadix
- Development Plan Rambla Fanals
- Global Intervention.Girona
- Lech Walesa eco-neighborhood. Le Kremlin-Bicêtre - Paris
- Mostenses Square.Madrid
- PAU 19 Calonge Urbanization – 44 housing units
- PEU 1.Palafrugell
- PMU Caves Peralada
- PMU-07 La Punta, Calonge. Preliminary study
- Partial Plan.Peralada
- Port of Ibiza. Spain
- Special Plan Riu campsite
- UIP. Llança
- Urban Plan. Altafulla
- Urban Plan. Altafulla
- Urban Plan. Brises del Mar
- Urban Plan. Cassà
- Urban Plan. Els Munts
- Urban Plan. Guadix Golf
- Urban Plan. Rambla Fanals
- Urban Plan. Sant Feliu
- Urban Plan. St. Feliu
- Urban Plan. Torredembarra
- Urban Plan.Girona
Special Urban Plan. Sector PP5. L'hort d'en Pau. Altafulla, Tarragona.
This Master Plan is developed to complete the General Urban Plan normative of this sector, approved by the Tarragona Urban City Council.
The project tries to reinforce the road next to the elevated road train, which is the access to the sector from the N-340 main road. The proposal also improves the Mar Street as an important road joint with the public equipment area like the train station entry.
At the south end of the project area we establish a new street with width and forest sidewalks, which follows east-west directions, parallel to the train rails and going along with the forest park, keeping away the train presence and noise pollution. In the northwest limit there is a camping area where is planed the extension of the road until the N-340 main road connecting finally with the AP-7 highway.
The project tries to reinforce the road next to the elevated road train, which is the access to the sector from the N-340 main road. The proposal also improves the Mar Street as an important road joint with the public equipment area like the train station entry.
At the south end of the project area we establish a new street with width and forest sidewalks, which follows east-west directions, parallel to the train rails and going along with the forest park, keeping away the train presence and noise pollution. In the northwest limit there is a camping area where is planed the extension of the road until the N-340 main road connecting finally with the AP-7 highway.
Situation: Sector PP5 Altafulla, Tarragona.
Area: 8.6 Ha
Cutomer: Junta de Compensació PP5.
Houses: 217 houses.
Year: 2004
Area: 8.6 Ha
Cutomer: Junta de Compensació PP5.
Houses: 217 houses.
Year: 2004