Jordi Marcè
cronology
- 3 Plazas.Andorra
- Air Conditionning . Mollet del Vallès
- Arcades. Skikda
- Cabeca. Andorra
- Competitiom.Panama
- Competition.Barcelona
- Competition.Barcelona
- Construction Phase 1. Andorra
- Construction. Andorra
- Facilities. Panama
- Maritime Terminal. Mallorca
- Mosque. Calonge.
- Rambla Fanals Civil Works
- Rehabilitation
- Sant Iscle Land Development
- UB Building construction. Barcelona
- Urbanization . Gerona
- Urbanization Cabeca Final P-1
- Urbanization. Altafulla I
- Urbanization. Altafulla II
- Urbanization. Altafulla III
- Urbanization. Andorra
- Urbanization. Guadix Golf
- Urbanization. Platja d'Aro I
- Urbanization. Platja d'Aro II
- Urbanization. Sant Boi
- Urbanization. Torredembarra
- Urbanization.Andorra
Final Phase 1 Urbanization of the UA Cabeca. Sector of Cabeca, Andorra
The works have been carried out in the municipality of Encamp in the Principality of Andorra.
The works of the first phase of urbanization of the UA Cabeca have been carried out. The works have been for 11 months, from September 2016 to July 2017.
The works carried out consisted of the earthworks of the roads, the construction of the wall beside the river, the channeling of two torrents and the basic networks of facilities.
The works of the first phase of urbanization of the UA Cabeca have been carried out. The works have been for 11 months, from September 2016 to July 2017.
The works carried out consisted of the earthworks of the roads, the construction of the wall beside the river, the channeling of two torrents and the basic networks of facilities.
Location: Andorra
Total project Area: 140.000m2
Year: 2017
Budget: 3.059.960 (E)
Total project Area: 140.000m2
Year: 2017
Budget: 3.059.960 (E)