ADEQUACY OF AIR CONDITIONING INSTALLATION IN DESTINED BUILDING TO CENTER OF RESEARCH (TURNING CT) and OFFICIAL SCHOOL OF LANGUAGES

The building of the Town Council of Mollet, destined for a Research center (GIRO CT), it had had other uses. Among them, it had been a University School of Environment.
When the concession to use the building as a center of research, with a special space for a official school of languages, the distribution of spaces and, especially, the use and the activities developed in here where modified.
As a condition of been a space of investigation and experimentation, in one side of the building are now displayed laboratories with the presence of chemical substances, biological processes, etc, what makes the existent air conditioning installation not adapted.
Moreover, the building does not have an air renewal (ventilation), installation what is absolutely necessary to the activities that now are develop.
The work consists of the writing of the Executive Project to substitute the current air conditioning installation of the building and to incorporate a ventilation installation, with circuit of impulsion and extraction of air.
Year: 2.009
Location: Rambla Pompeu Fabra1, Mollet del Vallès. Barcelona
Client: Mollet del Vallès City Council
Building area: 3.000m