Jordi Marcè
cronology
- 3 Plazas.Andorra
- Air Conditionning . Mollet del Vallès
- Arcades. Skikda
- Cabeca. Andorra
- Competitiom.Panama
- Competition.Barcelona
- Competition.Barcelona
- Construction Phase 1. Andorra
- Construction. Andorra
- Facilities. Panama
- Maritime Terminal. Mallorca
- Mosque. Calonge.
- Rambla Fanals Civil Works
- Rehabilitation
- Sant Iscle Land Development
- UB Building construction. Barcelona
- Urbanization . Gerona
- Urbanization Cabeca Final P-1
- Urbanization. Altafulla I
- Urbanization. Altafulla II
- Urbanization. Altafulla III
- Urbanization. Andorra
- Urbanization. Guadix Golf
- Urbanization. Platja d'Aro I
- Urbanization. Platja d'Aro II
- Urbanization. Sant Boi
- Urbanization. Torredembarra
- Urbanization.Andorra
Urban Development Plan Sector SUD-4 Rambla Fanals, Platja d'Aro
The civil works project for the Rambla Fanals sector is being drawn up as part of the processing of the land development plan.
The definition of the road network is made following the indications that derive directly from the local planning regulation and the details are planned in accordance with the built-up areas that surround us. A central promenade is created starting from a new roundabout located on Carrer de l'Església (to the south of the sector) going up until it connects with the northern streets, with an easy connection to the GI-665 road.
The rest of the streets are perpendicular to the central promenade, with a smaller width (8m wide), with priority for pedestrians, connecting the promenade with the surrounding streets. They are of the single-platform type.
The definition of the road network is made following the indications that derive directly from the local planning regulation and the details are planned in accordance with the built-up areas that surround us. A central promenade is created starting from a new roundabout located on Carrer de l'Església (to the south of the sector) going up until it connects with the northern streets, with an easy connection to the GI-665 road.
The rest of the streets are perpendicular to the central promenade, with a smaller width (8m wide), with priority for pedestrians, connecting the promenade with the surrounding streets. They are of the single-platform type.
Location: Platja d’Aro, Girona
Year: 2024
Client: City Council of Castell d’Aro, Platja d’Aro i S’Agaró
Area: 7,73Ha
Year: 2024
Client: City Council of Castell d’Aro, Platja d’Aro i S’Agaró
Area: 7,73Ha