Jordi Marcè
cronology
- 3 Plazas.Andorra
- Air Conditionning . Mollet del Vallès
- Arcades. Skikda
- Cabeca. Andorra
- Competitiom.Panama
- Competition.Barcelona
- Competition.Barcelona
- Construction Phase 1. Andorra
- Construction. Andorra
- Facilities. Panama
- Maritime Terminal. Mallorca
- Mosque. Calonge.
- Rambla Fanals Civil Works
- Rehabilitation
- Sant Iscle Land Development
- UB Building construction. Barcelona
- Urbanization . Gerona
- Urbanization Cabeca Final P-1
- Urbanization. Altafulla I
- Urbanization. Altafulla II
- Urbanization. Altafulla III
- Urbanization. Andorra
- Urbanization. Guadix Golf
- Urbanization. Platja d'Aro I
- Urbanization. Platja d'Aro II
- Urbanization. Sant Boi
- Urbanization. Torredembarra
- Urbanization.Andorra
Competition. Maritime Facilities for the Cruise Port of Amador, Perico Island, Panama
The maritime facilities are designed to provide simultaneous service for two mega cruises of 360m and future expansion with the addition of a future dock that will provide two additional docking lines.
For this, a number of factors were considered, such as the design vessel, sea water levels, topographic and bathymetric surveys, seafloor reconnaissance, maritime climate, tidal circulation, environmental and seismic actions, dredging and filling.
The proposal was developed with the engineering firm Estudio 7, DEME, Incostas and Acciona Panama.
For this, a number of factors were considered, such as the design vessel, sea water levels, topographic and bathymetric surveys, seafloor reconnaissance, maritime climate, tidal circulation, environmental and seismic actions, dredging and filling.
The proposal was developed with the engineering firm Estudio 7, DEME, Incostas and Acciona Panama.
Location: Panama City, Panama.
Surface area: 8.3 Ha.
Year: 2017
Surface area: 8.3 Ha.
Year: 2017