Construction of UA Cabeca area, Phase 2, Andorra.

The urbanization project of the UA Cabeca is developed in 2 phases due to its large size.
The present project corresponds to Phase 2.
The works to be done and constructed are:
Earthworks, Paving, sanitation networks, water, electricity, public lighting, irrigation, telephony, risk and avalanche protection, waste collection and other community requirements.
Location: Andorra
Total project Area: 192.251,67m2
Roads total Surface: 27.457,2 m2
Year: 2018