Jordi Marcè
cronology
- 3 Plazas.Andorra
- Air Conditionning . Mollet del Vallès
- Arcades. Skikda
- Cabeca. Andorra
- Competitiom.Panama
- Competition.Barcelona
- Competition.Barcelona
- Construction Phase 1. Andorra
- Construction. Andorra
- Facilities. Panama
- Maritime Terminal. Mallorca
- Mosque. Calonge.
- Rambla Fanals Civil Works
- Rehabilitation
- Rutlla Palamós - Urban Development
- Sant Iscle Land Development
- UB Building construction. Barcelona
- Urbanization . Gerona
- Urbanization Cabeca Final P-1
- Urbanization. Altafulla I
- Urbanization. Altafulla II
- Urbanization. Altafulla III
- Urbanization. Andorra
- Urbanization. Guadix Golf
- Urbanization. Platja d'Aro I
- Urbanization. Platja d'Aro II
- Urbanization. Sant Boi
- Urbanization. Torredembarra
- Urbanization.Andorra
Urban Development Project for the PPU-09 NE La Rutlla Sector in Palamós and Sant Joan in Palamós i Sant Joan
The PPU-09 NE La Rutlla urban development sector was established with the creation of the Eastern Ring Road, which provides a direct link between the C-31 highway and the marina and the La Fosca residential area, passing to the east of the historic centers of Sant Joan and Palamós.
The site is trapezoidal in shape and is located at the edge of the Sant Joan residential area—a medium-density neighborhood consisting of row single-family homes and multi-family buildings of 3 to 4 stories.
The urban development project outlines the essential and supplementary infrastructure for the sector, including: sanitation systems (stormwater and sewage collectors), the grading and compaction of land designated for roadways, utility and service networks, paving, public lighting, and street furniture. It also specifies landscaping (tree planting), embankments, and perimeter buffer zones, with the aim of integrating the area into the existing urban fabric and infrastructure.
The site is trapezoidal in shape and is located at the edge of the Sant Joan residential area—a medium-density neighborhood consisting of row single-family homes and multi-family buildings of 3 to 4 stories.
The urban development project outlines the essential and supplementary infrastructure for the sector, including: sanitation systems (stormwater and sewage collectors), the grading and compaction of land designated for roadways, utility and service networks, paving, public lighting, and street furniture. It also specifies landscaping (tree planting), embankments, and perimeter buffer zones, with the aim of integrating the area into the existing urban fabric and infrastructure.
Location: Palamós i Sant Joan, Girona
Year: 2026
Area: 15,900 sqm
Year: 2026
Area: 15,900 sqm