PP5 Urbanization, Altafulla.

The main challenge of this project was to connect this area with the town of Altafulla in terms of urbanization, infrastructures and installations.

Works on water ducts were done passing four pipes of 800mm. and 25 metres long next to the railway that connects the Mediterranean coast with Europe without interfering on its operation and function.

A main avenue and a park was build that helped to connect pedestrian pathways and traffic.
Year: 2003
Situation: Altafulla / Tarragona
Client: Junta de compensació, sector PP5 Altafulla
Area: 86.7 Ha.
Built area: 28.800 m2