The construction work of the underground parking building below the Europe Square in the city of Platja d'Aro, Girona, Spain had as main difficulty of the presence of water table level just below the foundations of this building.

A waterproof cover was made to protect the foundation concrete slab. All security measures were held out to build the steel structure of the slab and the waterproof asphalt cover.

The execution of the foundation concrete slab was made in ona phase during 4 days without interruption placing a total of 5000m3 of concrete and following every quality and safety controls.
Year: 2002
Location: Platja d'Aro , Girona
Client: Parbla SL, SABA S.A.
Area: 3.0 Has.
Built area: 8.000 m2
Budget: 3.605.000 (E)