Jordi Marcè
cronology

Coastal path at Les Cadiretes – Calonge. Progress of the construction works

The construction works for the improvement of the coastal path (camino de ronda) at Puig de les Cadiretes are progressing at a good pace and you can already see the profile of the section that connects the beaches of Can Cristus and Ses Torretes.

This stretch of the coastal path is one of the most unique places on the seafront of Calonge i Sant Antoni, due to the panoramic views it offers, but at the same time it is not very accessible and needs to improve safety, especially at the point where the rocks from the Puig de les Cadiretes reach the coast. The improvement works aim to make the path safer and are part of a global strategy to improve the Calonge and Platja d'Aro coastal path.
Location: Calonge i Sant Antoni, Girona
Year: 2023
Client: Calonge i Sant Antoni City Council